Module 7 - Change ← PRINCE2® PRINCE2® – 7.1.1 – Change theme Introduction PRINCE2® – 7.1.2 – Change theme minimum requirements PRINCE2® – 7.1.3 – Issue types PRINCE2® – 7.2.1 – Issue and Change control procedure PRINCE2® – 7.2.2 – Issue and Change control procedure (Handling RFC’s and Off-Specs) PRINCE2® – 7.2.3 – Issue and Change control procedure (Handling Problem or concerns) PRINCE2® – 7.2.4 – Issue and Change control procedure (Using Change budget or Tolerances) PRINCE2® – 7.3.1 – Change control approach Introduction PRINCE2® – 7.3.2 – Change control approach content PRINCE2® – 7.4.1 – Issue register PRINCE2® – 7.4.2 – Issue report PRINCE2® – 7.5.1 – Configuration management 12»Page 1 of 2